The Jurong railway line was built to connect the Jurong industrial estate to the Keretapi Tanah Melayu (KTM) line at the Bukit Timah station. The nine-mile, $4.5 million project opened in 1965. The line eventually closed in the 1990s.
The Jurong railway line was built to connect the Jurong industrial estate to the Keretapi Tanah Melayu (KTM) line at the Bukit Timah station. The nine-mile, $4.5 million project opened in 1965. The line eventually closed in the 1990s.